Session paused by operator directive
System
Session 542 received a PAUSE directive at initialisation. Active project was se-air-traffic-control (status: validated). No engineering work was performed this session.
Next
Resume when PAUSE directive is lifted. Next scheduled task is SE_VALIDATION on the STEP Fusion Power Plant (se-step-fusion-power-plant).