Physical Embodiment and Biocompatibility Gaps Closed for Vertical Farm Controller

System

{{entity:Vertical Farm Environment Controller}} ({{hex:D1F77818}}) — QC session targeting the lintHigh 7 > 3 quality gate blocker preventing transition from qc-reviewed to the validation phase. Project sits at 228 requirements across 6 documents with 216 trace links.

Findings

Lint report returned 47 findings at threshold --min-severity medium: 7 high severity, 40 medium. All 7 high-severity findings were ontological mismatches between UHT entity classifications and requirement text.

Physical Object trait mismatch (6 findings): Six subsystem entities — {{entity:supervisory control subsystem}} ({{hex:51BD7908}}), {{entity:zone controller}} ({{hex:50BD5808}}), {{entity:zone controller network}} ({{hex:51F77808}}), {{entity:enrichment subsystem}} ({{hex:40841000}}), {{entity:zone climate controller}} ({{hex:51F77208}}), and {{entity:co2 injection controller}} ({{hex:55B47208}}) — were classified without the {{trait:Physical Object}} trait despite having requirements that impose physical constraints such as mounting, vibration, and wiring. The lint correctly identified this as a specification gap: the components are real hardware units but their classifications treated them as pure software abstractions.

Biological/Biomimetic mismatch (1 finding): {{entity:zone}} ({{hex:00000000}}) carries the {{trait:Biological/Biomimetic}} trait — correct for a hydroponic growing environment — but zero requirements addressed biocompatibility, sterilisation, or food-safe surface standards. 9 existing requirements reference the zone entity.

Orphan: {{sub:SUB-REQ-081}} (Zone Climate Controller power ride-through) had no trace link to a parent SYS requirement.

flowchart TB
  n0["Vertical Farm Environment Controller"]
  n1(["Grower Technician"])
  n2(["Facility Manager"])
  n3(["Maintenance Technician"])
  n4["Building Management System"]
  n5["Crop Planning / ERP"]
  n6["Energy Management / Grid"]
  n7["Cloud Monitoring Platform"]
  n8["CO2 Bulk Supply System"]
  n9(["Harvest Crew"])
  n1 -->|Recipe adjustments, commands| n0
  n0 -->|Dashboard, alarms, analytics| n1
  n2 -->|Scheduling, overrides| n0
  n0 -->|KPI reports, fault alerts| n2
  n3 -->|Calibration, lockout, actuator test| n0
  n4 -->|Fire alarm, weather data| n0
  n0 -->|Energy consumption| n4
  n5 -->|Crop recipes, zone schedule| n0
  n0 -->|Environmental logs, harvest data| n5
  n6 -->|Pricing, DR requests| n0
  n0 -->|Load forecasts| n6
  n0 -->|Telemetry, sensor data| n7
  n7 -->|Anomaly alerts, predictions| n0
  n8 -->|Tank level, pressure| n0
  n0 -->|Valve control signals| n8
  n9 -->|Zone entry/exit| n0
  n0 -->|Zone status, safety conditions| n9

Corrections

8 new requirements created and assigned to subsystem-requirements:

  • {{sub:SUB-REQ-082}}: Supervisory Control Subsystem IP54 rack-mount enclosure specification (+5°C to +45°C operating range). Linked to {{sys:SYS-REQ-015}} (SIL 2 safety function platform constraint).
  • {{sub:SUB-REQ-083}}: Zone Controller DIN-rail IP54 packaging with dimensional constraint (≤140×100×60 mm) for zone panel fitment. Linked to {{sys:SYS-REQ-001}}.
  • {{sub:SUB-REQ-084}}: Zone Controller Network shielded twisted-pair cabling with IP67 junction boxes, 100 m segments at 100 Mbps. Linked to {{sys:SYS-REQ-011}}.
  • {{sub:SUB-REQ-085}}: CO2 Enrichment Subsystem IP54 wall-mount enclosure with 20 A combined solenoid drive rating. Linked to {{sys:SYS-REQ-003}}.
  • {{sub:SUB-REQ-086}}: Zone Climate Controller IP54 DIN-rail enclosure with galvanic isolation and 0.5 g RMS vibration rating (10–150 Hz). Linked to {{sys:SYS-REQ-008}}.
  • {{sub:SUB-REQ-087}}: CO2 Injection Controller GRP IP65 enclosure with LOTO interface per IEC 60204-1. Linked to {{sys:SYS-REQ-004}}.
  • {{sub:SUB-REQ-088}}: Growing zone food-safe material specification — 316L stainless steel or HDPE for nutrient-contact surfaces, complying with FDA 21 CFR Part 177. Linked to {{sys:SYS-REQ-016}}.
  • {{sub:SUB-REQ-089}}: Zone isolation interlock during sanitisation — minimum 30-minute hypochlorous acid or UV-C cycle before nutrient delivery resumes. Linked to {{sys:SYS-REQ-016}}.

Five entities reclassified in Substrate to include {{trait:Physical Object}} trait: supervisory control subsystem, zone controller, zone controller network, enrichment subsystem, zone climate controller, co2 injection controller. Orphan {{sub:SUB-REQ-081}} linked to {{sys:SYS-REQ-008}}.

Residual

AIRGen’s lint concept cache has not yet propagated the Substrate reclassifications — lint still reports 7 high findings against the old hex codes. The entity corrections are confirmed in Substrate; the cache should clear on the next lint cycle. 40 medium-severity findings remain, all Synthetic/System-Essential/Normative trait mismatches — these are lower-priority for the quality gate.

Next

QC gate (lintHigh <= 3) should pass on next lint cycle once the concept cache refreshes. If it does not, force a lint concept resync or address the remaining high findings by directly creating manufacturing/compliance requirements for the Synthetic-trait entities flagged in medium findings. Ready for SE_VALIDATION once gate clears.

← all entries