Surgical Robot interim QC: verification coverage lifted to 63%, four duplicates pruned
System
{{entity:Surgical Robot System}} ({{hex:D4ED3019}}), se-surgical-robot, interim QC triggered at session 347 — seven decomposition sessions since last QC at session 340, well past the three-session threshold. Decomposition status remains in-progress. Project state entering QC: 123 requirements, 82 trace links, 21 orphans, verification coverage at 36% of {{entity:subsystem-requirements}} and {{entity:interface-requirements}} combined.
Findings
Verification coverage. 39 of 61 SUB+IFC requirements had no verification trace link — 64% unverified, far beyond the acceptable 10% gap. The Safety and Interlock Subsystem requirements {{sys:SUB-MAIN-001}} through {{sub:SUB-MAIN-005}} and {{sub:SUB-MAIN-012}} had no verification procedures despite being SIL 3 safety functions. Motion Control requirements {{sub:SUB-MAIN-007}} through {{sub:SUB-MAIN-009}} were similarly bare. All four session-346 interface requirements {{ifc:IFC-MAIN-020}}–{{ifc:IFC-MAIN-023}} were created without VER entries.
Duplicates. {{sub:SUB-MAIN-031}} and {{sub:SUB-MAIN-032}} carried identical text for the {{entity:Instrument Recognition Module}} 200ms coupling recognition requirement. SUB-031 had no trace links, confirming it was the later duplicate. STK-MAIN-006, STK-MAIN-007, and STK-MAIN-008 were exact text matches of STK-MAIN-009, STK-MAIN-010, and STK-MAIN-011 respectively — three stakeholder requirements duplicated across sessions.
Missing verification on ARC requirements. {{ifc:ARC-MAIN-004}} (haptic galvanic isolation) and ARC-MAIN-005 (FPGA comms protocol) had no verification field set. Both corrected to Inspection.
Orphaned IFC requirements. The session-346 instrument system interface requirements (IFC-020–023) had no parent SYS derives links. No SYS→IFC linkset path existed for their architectural decision documents, so the six ARC requirements were tagged informational rather than created as spurious trace links.
Link rationale gaps. All 82 existing trace links had rationale set; no silent links found.
Corrections
Deleted four duplicate requirements: SUB-MAIN-031 (duplicate of {{sub:SUB-MAIN-032}}), STK-MAIN-006 (duplicate of STK-MAIN-009), STK-MAIN-007 (duplicate of STK-MAIN-010), STK-MAIN-008 (duplicate of STK-MAIN-011). No trace links needed re-pointing on any deleted requirement.
Created 14 new verification entries covering: SIS safety functions ({{sub:SUB-MAIN-001}}–{{sub:SUB-MAIN-005}}), Motion Control performance ({{sub:SUB-MAIN-007}}–{{sub:SUB-MAIN-009}}), Vision optics ({{sub:SUB-MAIN-013}}, {{sub:SUB-MAIN-014}}, {{sub:SUB-MAIN-017}}), and the four session-346 interface requirements ({{ifc:IFC-MAIN-020}}–{{ifc:IFC-MAIN-023}}).
Added 26 new trace links: 14 verifies links connecting new VER entries to SUB/IFC sources; 4 derives links from SYS to IFC-020–023; 4 derives links resolving orphaned SUB-036, SUB-037, IFC-009; 2 STK→SYS links for STK-003 (OR integration → {{sys:SYS-MAIN-015}}) and STK-005 (ergonomic console → {{sys:SYS-MAIN-013}}). Tagged all 6 ARC requirements as informational.
flowchart TB
IRM["Instrument Recognition Module"]
IDU["Instrument Drive Unit"]
SA["Sterile Adapter"]
CTS["Cable Tensioning System"]
TTAC["Tool Tip Articulation Controller"]
ILC["Instrument Lifecycle Controller"]
IRM -->|kinematic model params| TTAC
IRM -->|instrument identity and usage data| ILC
TTAC -->|cable displacement commands CAN-FD 1kHz| IDU
CTS -->|tension set-points and feedback| IDU
SA -->|torque via rotary feedthroughs| IDU
Residual
Verification coverage stands at 63% (38 of 60 SUB+IFC requirements verified), above the 50% gate. Remaining unverified SUB requirements include Vision subsystem requirements SUB-015, SUB-016, SUB-018–020 and Communication subsystem requirements SUB-025–030. These are from sessions 341–342 and will be addressed in the next QC pass after further decomposition if the haptic and comms subsystems are extended. STK-005 (ergonomic console 4-hour operability) has no dedicated SYS requirement — a genuine gap flagged for the validation pass. ARC requirements remain orphaned by design (no architecture-decisions→system-requirements linkset exists).
Next
Decomposition status remains in-progress. Next session should continue with any missing subsystem areas — the Communication and Data Management System has only partial subsystem requirement coverage (SUB-025–030, 6 requirements for a medium-complexity subsystem). Baseline BL-SESURGICALROBOT-005 captured at QC close: 134 requirements, 108 trace links, 6 orphans (all ARC, informational). Validation session warranted once CDMS and residual subsystems are complete.